Release |
Type |
Reference |
Area |
Summary |
Description |
943.54 |
Issue |
E#515 |
Budget |
Fixed issue where stages were not listed in the Budget stage summary table. |
|
943.15 |
Change |
B#648 |
Budget |
The Margin $ and Markup % calculations have changed to match standard accounting definitions. Refer to the user guide. |
|
939.2 |
Change |
EC#6015 |
Budget |
The calculations for the new fields added in EC#5354 have been corrected to include only those sub-consultants / expenses where To Invoice / Add to Price is ticked. The figures should reflect only what is going to be billed. |
|
930.16 |
Change |
EC#5893 |
Budget |
Planned Expenses have been removed from the Price Structure table so that the total displayed equals the sum of the items listed. |
|
925.0 |
Issue |
F9#88 |
Budget |
Budget tab refreshes automatically after editing ETC or Plan in the Assigned To table. |
|
921.29 |
Issue |
AH62 |
Budget |
The Budget Table will automatically refresh after the ETC hours in the Assigned To table has been edited. |
|
921.26 |
Issue |
AH50 |
Budget |
Issue with all assignees being removed after adding an assignee to a task has been resolved |
|
921.04 |
Issue |
EC#5686 |
Budget |
Can now edit Price in Stage tab when Fee Type is Time Based |
|
921.02 |
Issue |
EC#5690 |
Budget |
Issue with budget screen not populating upon initial load has been resolved. |
|
921.0 |
Issue |
EC#5694 |
Budget |
ETCs now increment or decrement successfully |
|
916.03 |
Issue |
EC#1125 |
Budget |
WIP column on right of Price structure table in Project Budget Tab is now not cut off on edge of screen and can be accessed. |
|
916.03 |
New Feature |
|
Budget |
In the top right area of a Project\'s Budget tab, Variations and Sub Consultants\' Actual Charges have been separated out as separate amounts |
|
915.0 |
New Feature |
ESR1234.c5 |
Budget |
On the Project Budget tab in the Price Structure table, the Fixed Price and Lump Sum checkboxes have been replaced with a dropdown with Fixed Price, Time Based and (if configured) % Based. |
The dropdown sets and clears the original checkboxes as follows: Fixed Price sets FP=On and LS=On % Based sets FP=On and LS=Off Time Based sets FP=Off (and LS=Off although this makes no difference) |
911.5 |
Issue |
9101.ag1c |
Budget |
Fixed issue where assignee rate did not load when person added to assignee table or when Update Assignee Rates utility run. |
|
856.4 |
Issue |
EC#5110 |
Budget |
Fixed error that caused the Lump Sum checkbox to revert to being unticked after a user ticked it and changed screens or logged out. |
|
849.8 |
Issue |
EC#4830 |
Budget |
Fixed issue where Original Contract Value field was being set to a large random number due to an invalid calculation. |
|
849.8 |
Issue |
EC#4914 |
Budget |
Fixed issue where % of Revised Contract Value field was resetting to $0 on entry to the Budget tab which subsequently cleared Contract Fee and %-based Stage Prices. |
|
840.8 |
Change |
EC#3688 |
Budget |
The way Price is calculated for % Based stages (ie: Fixed Price ticked and Lump Sum not ticked) has changed to Price = % of Contract * Contract Fee. |
This applies to the Project Budget tab (Price structure table) and Stage Details tab (Cost Structure section). If you would like to use the old formula ie: Price = % of Contract * [Contract Fee - sum (lump sum Prices)] add this line to eTrack Settings under [Options] PercentofContractCalc=1 |
840.12 |
Change |
EC#4777 |
Budget |
If Lump Sum on a stage is not ticked, Price cannot be edited as it is calculated as a % of Contract Fee. |
|
838.27 |
Change |
S100 |
Budget |
Added radio buttons so user can select whether the architect’s project fee is a fixed Contract Fee or calculated as a % of the contract (construction) value. |
|