943.15 |
Issue |
E#351 |
Schedule |
Fixed Schedule error that occurred when right-clicking on Current Staff or a Project and select Schedule. |
|
943.15 |
Issue |
E#351 |
Schedule |
Fixed error that would occur when selecting the little Details tab in Schedule and back to the little Schedule tab. |
|
940.12 |
Change |
|
Schedule |
In the Schedule tab there is My Work button at the top that shows you just the scheduled work (ETC red bars) of the selected staff member. This is now editable for staff members if you wish (see More…) |
In the Schedule tab there is My Work button at the top that shows you just the scheduled work (ETC red bars) of the selected staff member. Normally this is not allowed to be edited since won’t update dependant work items, and also typically the manager does these updates while looking at the whole project.
However, if the work items are independent of one another, and you wish the staff members to update their own schedule, then you can now make the My Work editable. (This is a Global Setting and not selective to the user.)
To turn on expand Setup in the tree and double click eTrack Settings. Scroll down to find [Options] and add a new row:
EditScheduleMyWork=1
Click Save and then click another item in the tree. Logout and in again for the change to take effect. |
931.03 |
Issue |
EC#5988 |
Schedule |
Issue some users were experiencing upon exiting eTrack after editing the Schedule has been resolved. |
|
921.12 |
Issue |
AH47 |
Schedule |
Issue some users encountered with Company and Staff Calendars being read only in the schedule has been resolved. |
|
860.1 |
Issue |
EC#5054 |
Schedule |
Fixed refresh issues in the Schedule when assigning a resource to a work item. |
These issues are resolved (i) the view reset to the top (ii) the person and work item are not visible until after refresh (iii) the person was duplicated after refresh. |
857.8 |
Change |
SVT#1186 |
Schedule |
When you click on a cell with a red bar (ETC) the status bar at the bottom will display who last modified (or created) it and when. |
|
854.11 |
Change |
SVT#1164 |
Schedule |
Added a new eTrack Settings [options] ScheduleWeeklyViewReadOnly. When set to 1 the Schedule cannot be edited when the Resolution is Hours/Week. |
|
853.1 |
Issue |
SVT#1157 |
Schedule |
Improved performance of Schedule that suffered a slowdown as a result of other changes. It is now faster than before. |
|
849.1 |
Issue |
EC#4879 |
Schedule |
When running the Resource Plan report in the Schedule the Show Only Active Work option is now set to match the Schedule view as indicated by the red A button. |
|
848.5 |
Change |
SVT#1082 |
Schedule |
Autosave files are now saved to the Backup directory on the server as set in eTrackConsole (default is c:\\etrack\\Backup). Users must have write access to this location. Filenames include the user\'s name. |
|
822.01 |
Issue |
EC#4251 |
Schedule |
Resolution for Actuals not being displayed in Schedule |
In previous releases, when ticking the checkbox in the Schedule Options to display Actuals, a refresh was done but Actual values were not being loaded from the database. This was a bug introduced due to the reversing of a flag that was not changed in one place in the code.
There was a work around: tick to include Actuals in the Schedule Open dialog.
If Actuals had previously been loaded in the session such as by looking at a timesheet or running a report, then they would be displayed, which explains why it appears intermittent. |
819.02 |
Issue |
EC#3635 |
Schedule |
Fixed error where actions in the Schedule caused projects to become duplicated in the tree. |
|