Release | Type | Reference | Area | Summary |
---|---|---|---|---|
956.0 | Issue | E#672 | Budget | Fixed issues with contract fee and %based stage price calculations. Also disabled the old %based stage price formula. More... |
Summary: Fixed issues with contract fee and %based stage price calculations. Also disabled the old %based stage price formula. More... | ||||
945.31 | Issue | E#503 | Budget | Updated the conditions for allowing Price to be edited More... |
Summary: Updated the conditions for allowing Price to be edited More... | ||||
944.15 | Issue | E#708 | Budget | Updated these fields on the Budget tab to show correct amounts: Forecast, Unbilled WIP, Invoice to Date and To Bill |
Summary: Updated these fields on the Budget tab to show correct amounts: Forecast, Unbilled WIP, Invoice to Date and To Bill | ||||
944 | Change | E#558 | Budget | For each staff member, if the Target Billed Hours was 0 (see Settings/Administration) it has been set to be the same as the Standard Working Hours. |
Summary: For each staff member, if the Target Billed Hours was 0 (see Settings/Administration) it has been set to be the same as the Standard Working Hours. | ||||
943.54 | Issue | E#515 | Budget | Fixed issue where stages were not listed in the Budget stage summary table. |
Summary: Fixed issue where stages were not listed in the Budget stage summary table. | ||||
943.15 | Change | B#648 | Budget | The Margin $ and Markup % calculations have changed to match standard accounting definitions. Refer to the user guide. |
Summary: The Margin $ and Markup % calculations have changed to match standard accounting definitions. Refer to the user guide. | ||||
939.2 | Change | EC#6015 | Budget | The calculations for the new fields added in EC#5354 have been corrected to include only those sub-consultants / expenses where To Invoice / Add to Price is ticked. The figures should reflect only what is going to be billed. |
Summary: The calculations for the new fields added in EC#5354 have been corrected to include only those sub-consultants / expenses where To Invoice / Add to Price is ticked. The figures should reflect only what is going to be billed. | ||||
930.16 | Change | EC#5893 | Budget | Planned Expenses have been removed from the Price Structure table so that the total displayed equals the sum of the items listed. |
Summary: Planned Expenses have been removed from the Price Structure table so that the total displayed equals the sum of the items listed. | ||||
925.0 | Issue | F9#88 | Budget | Budget tab refreshes automatically after editing ETC or Plan in the Assigned To table. |
Summary: Budget tab refreshes automatically after editing ETC or Plan in the Assigned To table. | ||||
921.29 | Issue | AH62 | Budget | The Budget Table will automatically refresh after the ETC hours in the Assigned To table has been edited. |
Summary: The Budget Table will automatically refresh after the ETC hours in the Assigned To table has been edited. | ||||
921.26 | Issue | AH50 | Budget | Issue with all assignees being removed after adding an assignee to a task has been resolved |
Summary: Issue with all assignees being removed after adding an assignee to a task has been resolved | ||||
921.04 | Issue | EC#5686 | Budget | Can now edit Price in Stage tab when Fee Type is Time Based |
Summary: Can now edit Price in Stage tab when Fee Type is Time Based | ||||
921.02 | Issue | EC#5690 | Budget | Issue with budget screen not populating upon initial load has been resolved. |
Summary: Issue with budget screen not populating upon initial load has been resolved. | ||||
921.0 | Issue | EC#5694 | Budget | ETCs now increment or decrement successfully |
Summary: ETCs now increment or decrement successfully | ||||
916.03 | Issue | EC#1125 | Budget | WIP column on right of Price structure table in Project Budget Tab is now not cut off on edge of screen and can be accessed. |
Summary: WIP column on right of Price structure table in Project Budget Tab is now not cut off on edge of screen and can be accessed. | ||||
916.03 | New Feature | Budget | In the top right area of a Project\'s Budget tab, Variations and Sub Consultants\' Actual Charges have been separated out as separate amounts | |
Summary: In the top right area of a Project\'s Budget tab, Variations and Sub Consultants\' Actual Charges have been separated out as separate amounts | ||||
915.0 | New Feature | ESR1234.c5 | Budget | On the Project Budget tab in the Price Structure table, the Fixed Price and Lump Sum checkboxes have been replaced with a dropdown with Fixed Price, Time Based and (if configured) % Based. More... |
Summary: On the Project Budget tab in the Price Structure table, the Fixed Price and Lump Sum checkboxes have been replaced with a dropdown with Fixed Price, Time Based and (if configured) % Based. More... | ||||
911.5 | Issue | 9101.ag1c | Budget | Fixed issue where assignee rate did not load when person added to assignee table or when Update Assignee Rates utility run. |
Summary: Fixed issue where assignee rate did not load when person added to assignee table or when Update Assignee Rates utility run. | ||||
856.4 | Issue | EC#5110 | Budget | Fixed error that caused the Lump Sum checkbox to revert to being unticked after a user ticked it and changed screens or logged out. |
Summary: Fixed error that caused the Lump Sum checkbox to revert to being unticked after a user ticked it and changed screens or logged out. | ||||
849.8 | Issue | EC#4830 | Budget | Fixed issue where Original Contract Value field was being set to a large random number due to an invalid calculation. |
Summary: Fixed issue where Original Contract Value field was being set to a large random number due to an invalid calculation. | ||||
849.8 | Issue | EC#4914 | Budget | Fixed issue where % of Revised Contract Value field was resetting to $0 on entry to the Budget tab which subsequently cleared Contract Fee and %-based Stage Prices. |
Summary: Fixed issue where % of Revised Contract Value field was resetting to $0 on entry to the Budget tab which subsequently cleared Contract Fee and %-based Stage Prices. | ||||
840.8 | Change | EC#3688 | Budget | The way Price is calculated for % Based stages (ie: Fixed Price ticked and Lump Sum not ticked) has changed to Price = % of Contract * Contract Fee. More... |
Summary: The way Price is calculated for % Based stages (ie: Fixed Price ticked and Lump Sum not ticked) has changed to Price = % of Contract * Contract Fee. More... | ||||
840.12 | Change | EC#4777 | Budget | If Lump Sum on a stage is not ticked, Price cannot be edited as it is calculated as a % of Contract Fee. |
Summary: If Lump Sum on a stage is not ticked, Price cannot be edited as it is calculated as a % of Contract Fee. | ||||
838.27 | Change | S100 | Budget | Added radio buttons so user can select whether the architect’s project fee is a fixed Contract Fee or calculated as a % of the contract (construction) value. |
Summary: Added radio buttons so user can select whether the architect’s project fee is a fixed Contract Fee or calculated as a % of the contract (construction) value. |