Release |
Type |
Reference |
Area |
Summary |
956.0 |
Issue |
E#672 |
Budget | Fixed issues with contract fee and %based stage price calculations. Also disabled the old %based stage price formula. More... |
Summary: Fixed issues with contract fee and %based stage price calculations. Also disabled the old %based stage price formula. More... |
945.31 |
Issue |
E#503 |
Budget | Updated the conditions for allowing Price to be edited More... |
Summary: Updated the conditions for allowing Price to be edited More... |
944.15 |
Issue |
E#708 |
Budget | Updated these fields on the Budget tab to show correct amounts: Forecast, Unbilled WIP, Invoice to Date and To Bill |
Summary: Updated these fields on the Budget tab to show correct amounts: Forecast, Unbilled WIP, Invoice to Date and To Bill |
944 |
Change |
E#558 |
Budget | For each staff member, if the Target Billed Hours was 0 (see Settings/Administration) it has been set to be the same as the Standard Working Hours. |
Summary: For each staff member, if the Target Billed Hours was 0 (see Settings/Administration) it has been set to be the same as the Standard Working Hours. |
943.54 |
Issue |
E#515 |
Budget | Fixed issue where stages were not listed in the Budget stage summary table. |
Summary: Fixed issue where stages were not listed in the Budget stage summary table. |
943.15 |
Change |
B#648 |
Budget | The Margin $ and Markup % calculations have changed to match standard accounting definitions. Refer to the user guide. |
Summary: The Margin $ and Markup % calculations have changed to match standard accounting definitions. Refer to the user guide. |
939.2 |
Change |
EC#6015 |
Budget | The calculations for the new fields added in EC#5354 have been corrected to include only those sub-consultants / expenses where To Invoice / Add to Price is ticked. The figures should reflect only what is going to be billed. |
Summary: The calculations for the new fields added in EC#5354 have been corrected to include only those sub-consultants / expenses where To Invoice / Add to Price is ticked. The figures should reflect only what is going to be billed. |
930.16 |
Change |
EC#5893 |
Budget | Planned Expenses have been removed from the Price Structure table so that the total displayed equals the sum of the items listed. |
Summary: Planned Expenses have been removed from the Price Structure table so that the total displayed equals the sum of the items listed. |
925.0 |
Issue |
F9#88 |
Budget | Budget tab refreshes automatically after editing ETC or Plan in the Assigned To table. |
Summary: Budget tab refreshes automatically after editing ETC or Plan in the Assigned To table. |
921.29 |
Issue |
AH62 |
Budget | The Budget Table will automatically refresh after the ETC hours in the Assigned To table has been edited. |
Summary: The Budget Table will automatically refresh after the ETC hours in the Assigned To table has been edited. |
921.26 |
Issue |
AH50 |
Budget | Issue with all assignees being removed after adding an assignee to a task has been resolved |
Summary: Issue with all assignees being removed after adding an assignee to a task has been resolved |
921.04 |
Issue |
EC#5686 |
Budget | Can now edit Price in Stage tab when Fee Type is Time Based |
Summary: Can now edit Price in Stage tab when Fee Type is Time Based |
921.02 |
Issue |
EC#5690 |
Budget | Issue with budget screen not populating upon initial load has been resolved. |
Summary: Issue with budget screen not populating upon initial load has been resolved. |
921.0 |
Issue |
EC#5694 |
Budget | ETCs now increment or decrement successfully |
Summary: ETCs now increment or decrement successfully |
916.03 |
Issue |
EC#1125 |
Budget | WIP column on right of Price structure table in Project Budget Tab is now not cut off on edge of screen and can be accessed. |
Summary: WIP column on right of Price structure table in Project Budget Tab is now not cut off on edge of screen and can be accessed. |
916.03 |
New Feature |
|
Budget | In the top right area of a Project\'s Budget tab, Variations and Sub Consultants\' Actual Charges have been separated out as separate amounts |
Summary: In the top right area of a Project\'s Budget tab, Variations and Sub Consultants\' Actual Charges have been separated out as separate amounts |
915.0 |
New Feature |
ESR1234.c5 |
Budget | On the Project Budget tab in the Price Structure table, the Fixed Price and Lump Sum checkboxes have been replaced with a dropdown with Fixed Price, Time Based and (if configured) % Based. More... |
Summary: On the Project Budget tab in the Price Structure table, the Fixed Price and Lump Sum checkboxes have been replaced with a dropdown with Fixed Price, Time Based and (if configured) % Based. More... |
911.5 |
Issue |
9101.ag1c |
Budget | Fixed issue where assignee rate did not load when person added to assignee table or when Update Assignee Rates utility run. |
Summary: Fixed issue where assignee rate did not load when person added to assignee table or when Update Assignee Rates utility run. |
856.4 |
Issue |
EC#5110 |
Budget | Fixed error that caused the Lump Sum checkbox to revert to being unticked after a user ticked it and changed screens or logged out. |
Summary: Fixed error that caused the Lump Sum checkbox to revert to being unticked after a user ticked it and changed screens or logged out. |
849.8 |
Issue |
EC#4830 |
Budget | Fixed issue where Original Contract Value field was being set to a large random number due to an invalid calculation. |
Summary: Fixed issue where Original Contract Value field was being set to a large random number due to an invalid calculation. |
849.8 |
Issue |
EC#4914 |
Budget | Fixed issue where % of Revised Contract Value field was resetting to $0 on entry to the Budget tab which subsequently cleared Contract Fee and %-based Stage Prices. |
Summary: Fixed issue where % of Revised Contract Value field was resetting to $0 on entry to the Budget tab which subsequently cleared Contract Fee and %-based Stage Prices. |
840.8 |
Change |
EC#3688 |
Budget | The way Price is calculated for % Based stages (ie: Fixed Price ticked and Lump Sum not ticked) has changed to Price = % of Contract * Contract Fee. More... |
Summary: The way Price is calculated for % Based stages (ie: Fixed Price ticked and Lump Sum not ticked) has changed to Price = % of Contract * Contract Fee. More... |
840.12 |
Change |
EC#4777 |
Budget | If Lump Sum on a stage is not ticked, Price cannot be edited as it is calculated as a % of Contract Fee. |
Summary: If Lump Sum on a stage is not ticked, Price cannot be edited as it is calculated as a % of Contract Fee. |
838.27 |
Change |
S100 |
Budget | Added radio buttons so user can select whether the architect’s project fee is a fixed Contract Fee or calculated as a % of the contract (construction) value. |
Summary: Added radio buttons so user can select whether the architect’s project fee is a fixed Contract Fee or calculated as a % of the contract (construction) value. |